Rounded Rectangle: DRAINAGE PROJECTS
Rounded Rectangle: Providing the Highest Level of Innovative Services
Civil Engineering, Structural Engineering, Electrical Design, Environmental Assessments, and  Surveying

DRAINAGE IMPROVEMENTS, ALEXANDRIA, LADrainage system improvements from Alexandria Mall to Horseshoe Canal including 600 LF of paved ditch and 1100 LF of 5' x 9' reinforced concrete box culvert.  The work including engineering designs, surveys, and construction inspection.

 

BALL AVENUE IMPROVEMENTS, ALEXANDRIA, LAReconstruction of (4) intersections on Ball Avenue between Olive and Madison Streets and on Madison Street between Ball and Roberts.  The work included utilities and drainage improvements.  Ballard CLC, Inc. provided all services required including surveys and construction inspection. 

 

LANDA STREET DRAINAGE IMPROVEMENTS, ALEXANDRIA, LAReconstruction of 600 LF of urban concrete street including utilities and drainage improvements.  Ballard CLC, Inc. provided all services required including surveys and construction inspection.

 

RENSSALEAR STREET IMPROVEMENTS, ALEXANDRIA, LARe-alignment of (2) block section of concrete street passing through a city park.  The work included off-street parking, fencing, landscaping, utilities, and drainage.  Ballard CLC, Inc. provided all services required including construction administration.

 

XAVIER STREET IMPROVEMENTS, ALEXANDRIA, LAPavement and subsurface drainage improvements to 700 LF of an industrial access thoroughfare.  The scope of the project included relocation of affected gas and water mains.  The work involved engineering designs, surveys, and monitoring of construction activity.

 

LOUISE STREET IMPROVEMENTS, ALEXANDRIA, LAReconstruction of an arterial city street and major intersection.  The project involved subsurface drainage improvements, pavement re-design, curb and gutter replacements, and relocation of gas and water mains.  The firm supplied engineering design, surveys, and monitored construction activities. 

 

6TH STREET - PHASE I, ALEXANDRIA, LADrainage system improvements including open ditches and 500 LF of 48" and 54" diameter sub-surface drainage pipe.  Ballard CLC, Inc. furnished engineering and surveying and monitored construction activities.

 

6TH STREET DRAINAGE IMPROVEMENTS, ALEXANDRIA, LAReplacement of a 5’x 5’ flood gate and realignment of the associated drainage channel.  The work included engineering design, topographic surveys, and the monitoring of construction activity.

 

CHEATHAM PARK PLAYGROUND IMPROVEMENTS, ALEXANDRIA, LAPhase I of improvements to a 25 acre urban park in a low to moderate income area.  The project includes a steel play structure with resilient ground surfacing, concrete paving, a pedestrian bridge, drainage improvements, a picnic area, and landscaping.  The work also involved schematic plans for future improvements including restrooms and an exercise track.  Ballard CLC, Inc. provides all professional services.

 

MEMORIAL DRIVE DRAINAGE IMPROVEMENTS AT LEE STREET, ALEXANDRIA, LAReconstruction of 200 LF of Memorial Drive at Coldstream Avenue and construction of drainage improvements including storm sewer pipe ranging from 18" RCP to 54" RCP as well as 615 LF of 8' X 5' RC Box Culvert.  The project included the relocation of utilities, topographic surveys and right-of-way surveys.  The firm prepared Preliminary and Final Plans.

 

HEYMAN LANE IMPROVEMENTS, ALEXANDRIA, LAReconstruction of 6,700 LF of Heyman Lane from Coliseum Blvd to Jackson Street under both Urban System Requirements for DOTD and City of Alexandria design requirements.  This project included the removal of the existing 20' Asphaltic concrete roadway with open ditches; replace 6,700 linear with 28' Portland Concrete with Curb and Gutter including subsurface drainage; Geometric Layout and Typical sections to include the wider roadway section with turn lanes and new alignment; relocate existing gas and water utilities including services and high pressure gas transmission line.  Coordinate with power and phone services for relocations; replace driveways and add sidewalk for residences; remove and replace existing 17 side roads including blvd; detour signage, sequence of construction and signalization layout; and convert project to metric during design phase.

 

JACKSON STREET IMPROVEMENTS, ALEXANDRIA, LAReconstruction and widening of 3,000 LF of Jackson Street from Bolton Avenue to 24th Street.  The project included drainage improvements and relocation of utilities.  The firm provided all professional services, including surveying.

 

MONROE STREET IMPROVEMENTS, ALEXANDRIA, LA:  Reconstruction of 1,500 LF of Monroe Street.  The project included improvements to the Bolton Avenue/Monroe Street intersection and the storm drainage system.  The firm provided engineering and surveying services.

 

BAYOU ROBERTS DRAINAGE IMPROVEMENTS—PHASE I:  Overflow/drainage structure including sub-surface and open channel drainage to control the elevation to Bayou Roberts for the City of Alexandria.

 

BAYOU ROBERTS DRAINAGE IMPROVEMENTS—PHASE II-IV: Re-establish an outfall of Bayou Roberts by constructing an earthen channel with roadway crossings and levee system to the Diversion Canal for the City of Alexandria.

 

Kellyland Subdivision Flood Control ProjectInstall a drainage system based on a 25 year rainfall event to reduce flooding frequency of Parish streets and private residences.  The project was designed to LaDOTD Statewide Flood Control Criteria.  The project included drainage and roadway design, right - of- way acquisition, and coordination with local utilities.

 

VILLAGE GREEN SUBDIVISION FLOOD CONTROL PROJECT Install a drainage system based on a 25 year rainfall event to reduce flooding frequency of Parish streets and private residences.  The project was design to LaDOTD Statewide Flood Control Criteria.  The project included drainage and roadway design, right - of- way acquisition, and coordination with local utilities.

 

Georgetown Drainage Improvements-Heyman Lane to Georgetown DriveReplace existing open ditches with subsurface drainage in State right - of- way to reduce flooding on local city streets.  The project included geometric layout, site grading, utility relocations, and drainage design for the City of Alexandria.

 

DURAWOOD DRAINAGE IMPROVEMENTS:  Replace existing failed driveway crossing with double 9 x 9 box culverts.  Install 19’ x 10’ vertical channel guardrail, fencing, etc.  The project included geometric layout, site grading, removal of contaminated soils, drainage design.  Services provided include survey, construction documents, construction administration and construction observation.